Wednesday, 26 June 2013

Upton-upon-Severn - High Street and Old Street improvement works

The window cleaning has comenced today and will halt when the town livens up. It will re-continue tomorrow.

Wednesday, 24 April 2013

Upton-upon-Severn - High Street and Old Street improvement works

The carriageway surface course was laid on Old Street on Sunday 21st April, 2013 with road markings put in place.

This week the local carpenter is continuing repairs on various shop front facia's etc.

We expect this work to take the rest of this week.  There are also outstanding remedial works to be undertaken shortly.


Above are some pictures of the surfacing work carried out at the weekend.
 
We will endeavour to keep disruption to a minimum when these works are carried out and we would very much appreciate your patience and co-operation during this period..

We will be updating this blog on a regular basis so please ensure you visit for further information. Alternatively you can find updates regarding works in the area on our Twitter account www.twitter.com/roadworks_info

Tuesday, 23 April 2013

Upton-upon-Severn - High Street and Old Street improvement works

The carriageway surface course was laid on Old Street on Sunday 21st April, 2013 with road markings put in place.
This week the local carpenter is continuing repairs on various shop front facia's etc.

We expect this work to take the rest of this week.  There are also outstanding remedial works to be undertaken shortly.

Below are some pictures of the surfacing work carried out at the weekend.




We will endeavour to keep disruption to a minimum when these works are carried out and we would very much appreciate your patience and co-operation during this period..

We will be updating this blog on a regular basis so please ensure you visit for further information. Alternatively you can find updates regarding works in the area on our Twitter account www.twitter.com/roadworks_info

Wednesday, 17 April 2013

Upton-upon-Severn - High Street and Old Street improvement works

We are not planning any works to be carried out by ourselves until Sunday 21st April, these works will consist of laying the carriageway surface course on Old Street plus the undertaking of roadmarking works.



We will endeavour to keep disruption to a minimum when these works are carried out and we would very much appreciate your patience and co-operation during this period..
Later today the local carpenter should commence work on various shop front facia's etc.

We will be updating this blog on a regular basis so please ensure you visit for further information. Alternatively you can find updates regarding works in the area on our Twitter account www.twitter.com/roadworks_info

Tuesday, 16 April 2013

Upton-upon-Severn - High Street and Old Street improvement works

No works are planned to be carried out by ourselves until Sunday 21st April, these works will consist of laying the carriageway surface course on Old Street plus the undertaking of roadmarking works.

We will endeavour to keep disruption to a minimum when these works are carried out and we would very much appreciate your patience and co-operation during this period..

We will be updating this blog on a regular basis so please ensure you visit for further information. Alternatively you can find updates regarding works in the area on our Twitter account www.twitter.com/roadworks_info

Monday, 15 April 2013

Upton-upon-Severn - High Street and Old Street improvement works

Yesterday, the carriageway surface course was laid on Lower High Street and High Street in Upton; sections of the roadmarking was also relaid. On Sunday 21st April, the carriageway surface course will be laid on Old Street plus roadmarking will be undertaken.


We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and co-operation during the completion of these works.

We will be updating this blog on a regular basis so please ensure you visit for further information. Alternatively you can find updates regarding works in the area on our Twitter account www.twitter.com/roadworks_info.

Friday, 12 April 2013

Upton-upon-Severn - High Street and Old Street improvement works

The resurfacing that is due to take place this Sunday 14th April, 2013 will be carried out under a road closure. We will close the High Street and Old Street to lay the wearing course to the road surface and replace the lining in Old Street , the Bus Stop and disabled parking in High Street.

To avoid congestion in "Minge Lane" two "no through" road signs will be put in place. The local carpenter will also start work repairing the damage to wooden fascia panels.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and co-operation during the completion of these works.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit. Alternatively you can find updates regarding works in the area on our Twitter account www.twitter.com/roadworks_info.

See below pictures taken during the improvement works.




Thursday, 11 April 2013

Upton-upon-Severn - High Street and Old Street improvement works

The resurfacing that is due to take place this Sunday 14th April, 2013 will be carried out under a road closure the road re-opening at all other times. To avoid congestion in Minge Lane two "no through "road signs will be put in place. The local carpenter will also start work repairing the damage to wooden fascia panels on Sunday.

The programme is as follows:-

Sunday 14/04/2013 closure of High Street and Old Street to lay wearing course and replace the lining in Old Street and the Bus Stop and disabled parking in High Street.
Sunday 21/04/2013 closure of High Street to complete the surfacing work and lining on adjacent road junctions to High Street.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and co-operation during the completion of these works.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit. Alternatively you can find updates regarding works in the area on our Twitter account www.twitter.com/roadworks_info
.

Pictures taken during the improvement work


Wednesday, 10 April 2013

Upton-upon-Severn - High Street and Old Street improvement works

The improvement works are nearing completion with the resurfacing of the carriageway left to complete the improvements. This will be carried out over two weeks, this Sunday 14th April, 2013 and next Sunday 21st April, 2013.

The resurfacing will be carried out under a road closure, due to the nature of the work and the width of the roads. The work is being carried out under a road closure, due to the nature of the work and the width of the roads. The work is being carried out on Sundays only and the road will be open at all other times.

The programme is as follows:-
Sunday 14/04/2013 closure of High Street and Old Street to lay wearing course and replace the lining in Old Street and the Bus Stop and disabled parking in High Street.
Sunday 21/04/2013 closure of High Street to complete the surfacing work and lining on adjacent road junctions to High Street.

The local carpenter has been unexpectedly delayed this week but will be starting work repairing the damage to wooden fascia panels later this week.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and co-operation during the completion of these works.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit . Alternatively you can find updates regarding works in the area on our Twitter account www.twitter.com/roadworks_info

Tuesday, 9 April 2013

Upton-upon-Severn - High Street and Old Street improvement works

The improvement works continue to go well with the resurfacing of the carriageway left to complete the improvements. This will be carried out over two weeks, this Sunday 14th April, 2013 and next Sunday 21st April, 2013.

The resurfacing will be carried out under a road closure, due to the nature of the work and the width of the roads. The work is being carried out under a road closure, due to the nature of the work and the width of the roads. The work is being carried out on Sundays only and the road will be open at all other times.

The programme is as follows:-
Sunday 14/04/2013 closure of High Street and Old Street to lay wearing course and replace the lining in Old Street and the Bus Stop and disabled parking in High Street.
Sunday 21/04/2013 closure of High Street to complete the surfacing work and lining on adjacent road junctions to High Street.

The local carpenter has been unexpectedly delayed this week but will be starting work repairing the damage to wooden fascia panels later this week.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and co-operation during the completion of these works.

We will be updating this blog on a daily basis (Monday to Friday) so lease ensure you visit . Alternatively you can find updates regarding works in the area on our Twitter account www.twitter.com/roadworks_info

Monday, 8 April 2013

Upton-upon-Severn - High Street & Old Street improvement works

The plane out and laying of the binder course at the start of the High Street to Back Fields at the bottom end of Old Street went to schedule yesterday.
There are now two Sundays work to complete the improvement works.   This will be carried out under a road closure, due to the nature of the work and the width of the roads. The work is being carried out on Sundays only and the road will be open at all other times.

The programme is as follows:-
Sunday 14/04/2013 closure of High Street and Old Street to lay wearing course and replace the lining in Old Street and the Bus Stop and disabled parking in High Street.
Sunday 21/04/2013 closure of High Street to complete the surfacing work and lining on adjacent road junctions to High Street.
Today a local carpenter will start repairing damage to wooden fascia panels. We expect this to take the rest of the week.




We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and cooperation during the completion of these works.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit

Friday, 5 April 2013

Upton-upon-Severn - High Street & Old Street improvement works

This Sunday 7th April, 2013 we will start the carriageway resurfacing. This will be carried out under a road closure, due to the nature of the work and the width of the roads. The work is being carried out on Sundays only and the road will be open at all other times.

The programme is as follows:-

Sunday 07/04/2013 closure of High Street to plane out and lay binder course from the start of the High Street to Back Fields at the bottom end of Old Street.
Sunday 14/04/2013 closure of High Street and Old Street to lay wearing course and replace the lining in Old Street and the Bus Stop and disabled parking in High Street.
Sunday 21/04/2013 closure of High Street to complete the surfacing work and lining on adjacent road junctions to High Street.

Advance yellow warning board signs have been put up to advise of the closure.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and cooperation during the completion of these works.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit

Thursday, 4 April 2013

Upton-upon-Severn - High Street & Old Street improvement works

Yesterday temporary road marking were made on the road.  

The resurfacing work that has to be completed will be carried out under a road closure,due to the nature of the work and the width of the roads. The work is being carried out on Sundays only and the road will be open at all other times. The work is weather dependent, the current programme is :-

Sunday 07/04/2013 closure of High Street to plane out and lay binder course from the start of the High Street to Back Fields at the bottom end of Old Street.
Sunday 14/04/2013 closure of High Street and Old Street to lay wearing course and replace the lining in Old Street and the Bus Stop and disabled parking in High Street.
Sunday 21/04/2013 closure of High Street to complete the surfacing work and lining on adjacent road junctions to High Street.

Advance yellow warning board signs have been put up to advise of the closure.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and cooperation during the completion of these works.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit regularly for updates on the progression of this scheme.  Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

Wednesday, 3 April 2013

Upton-upon-Severn - High Street & Old Street improvement works

A local carpenter will be repairing damage to wooden fascia panels week commencing 8th April, 2013. This will complete the remedial list with just the resurfacing of the road to complete the improvement works.

The resurfacing work that has to be done will be carried out under a road closure, due to the nature of the work and the width of the roads. The work is being carried out on Sundays only and the road will be open at all other times. The work is weather dependent, the current programme is :-

Sunday 07/04/2013 closure of High Street to plane out and lay binder course from the start of the High Street to Back Fields at the bottom end of Old Street.
Sunday 14/04/2013 closure of High Street and Old Street to lay wearing course and replace the lining in Old Street and the Bus Stop and disabled parking in High Street.
Sunday 21/04/2013 closure of High Street to complete the surfacing work and lining on adjacent road junctions to High Street.

Advance yellow warning board signs have been put up to advise of the closure.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and cooperation during the completion of these works.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit regularly for updates on the progression of this scheme.  Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

Tuesday, 2 April 2013

Upton-upon-Severn - High Street & Old Street improvement works

A local carpenter will be repairing damage to wooden fascia panels week commencing 8th April, 2013.

The resurfacing work that has to be done under a road closure, due to the nature of the work and the width of the roads, has been rescheduled due to the adverse weather to the following three Sundays :-

Sunday 7th April, 14th April and 21st April 2013

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and cooperation during the completion of these works.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit regularly for updates on the progression of this scheme.  Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

Thursday, 28 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

This week we will be carrying out some tidying up with the improvement works completed except for the  carriageway resurfacing and defect list to complete.

A local carpenter is repairing damage to wooden fascia panels week commencing 8th April, 2013.

The resurfacing work that has to be done under a road closure, due to the nature of the work and the width of the roads, has been rescheduled due to the adverse weather last week to the following three Sundays :-

Sunday 7th April, 14th April and 21st April 2013

The resurfacing work is weather dependant and may be cancelled at short notice.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and cooperation during the completion of these works.

Please note that our Liaison Officer Terry Godwin  is on Holiday this week from Monday 25th March, 2013 to Monday 1st April, 2013.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit regularly for updates on the progression of this scheme.  Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

Wednesday, 27 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

This week we will be carrying out some tidying up with the improvement works nearing completion.  We still have the carriageway resurfacing and defect list to complete.
A local carpenter is repairing damage to wooden fascia panels week commencing 8th April, 2013.

The resurfacing work that has to be done under a road closure, due to the nature of the work and the width of the roads, has been rescheduled due to the adverse weather last week to the following three Sundays :-

Sunday 7th April, 14th April and 21st April 2013

The resurfacing work is weather dependant and may be cancelled at short notice.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and cooperation during the completion of these works.

Please note that our Liaison Officer Terry Godwin  is on Holiday this week from Monday 25th March, 2013 to Monday 1st April, 2013.

We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit regularly for updates on the progression of this scheme.  Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

Tuesday, 26 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

This week we will be working through a remedial list which consists of a variety of defects mainly damage to rendering and wooden fascia panels. All rendering defects are completed apart from the painting of them which is in hand. A local carpenter is repairing damage to wooden fascia panels.

Due to the adverse weather last weekend the plane out and laying of binder course from the start of High Street to Back Fields at the bottom end of Old Street was cancelled.
 In this circumstance a new program of works will be issued shortly.

We will endeavour to keep disruption to a minimum during this period and we would very much appreciate your patience and cooperation during the completion of these works.

Please note that our Liaison Officer Terry Godwin  is on Holiday this week from Monday 25th March, 2013 to Monday 1st April, 2013.
We will be updating this blog on a daily basis (Monday to Friday) so please ensure you visit regularly for updates on the progression of this scheme.  Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info.

Monday, 25 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will continue the works started last week. Carrying out alterations to property downpipes, inserting bends onto the down-pipes to direct water across the footways, through fluted channels.

This week we will be working through a remedial list which consists of a variety of defects mainly damage to rendering and wooden fascia panels. All rendering defects are completed apart from the painting of them which is in hand. A local carpenter is repairing damage to wooden fascia panels.

Resurfacing Works
Due to the adverse weather this weekend the plane out and laying of binder course from the start of High Street to Back Fields at the bottom end of Old Street was cancelled.  A new program of works will be issued in this circumstance.


The picture above shows some of the completed footway resurfacing earlier on this month.

Please note that our Liaison Officer Terry Godwin  is on Holiday next week from Monday 25th March, 2013 to Monday 1st April, 2013 so if you would like further information please visit this blog site which is updated daily.

Alternatively please telephone our Customer Care Line on 01905 761176.

Friday, 22 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

This week we have been carrying out alterations to property downpipes, inserting bends onto the down-pipes to direct water across the footways, through fluted channels.

We have a remedial list which consists of a variety of defects mainly damage to rendering and wooden fascia panels. All rendering defects are completed apart from the painting of them which is in hand. Photographic evidence of damage to wooden fascia panels will be handed to a local carpenter today with a view to completing the works next week.

We have arranged for a window cleaner to clean all windows on shop frontages and private property where reconstruction works have taken place, this will not be done until all resurfacing works are completed (15th April, 2013).

Resurfacing Works

The resurfacing work has to be done under a road closure due to the nature of the work and the width of the roads. The work is being carried out on Sundays only and the road will be open at all other times. The work is weather dependent, the current programme is:-

Sunday 17/03/2013 Closure of High Street plane out the carriageway and laying binder course - Completed

Sunday 24/03/2013 Closure of Old Street to plane out and lay binder course from the start of High Street to Back Fields at the bottom end of Old Street.

Sunday 31/03/2013 No work due to Bank Holiday

Sunday 07/04/13 Closure of High Street and Old Street to lay wearing course and replace the lining in Old Street,the Bus Stop and disabled parking in High Street.

Sunday 14/04/2013 Closure of High Street to complete the surfacing work and lining on adjacent road junctions to High Street.

Please note that our Liaison Officer Terry Godwin  is on Holiday next week from Monday 25th March, 2013 to Monday 1st April, 2013 so if you would like further information please visit this blog site which is updated daily.

Alternatively please telephone our Customer Care Line on 01905 761176.


Thursday, 21 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we continue working on the High Street and Church Street area carrying out remedial works and installation of drainage channels.
 
 
 
 
There will be a road closure next Sunday 24th March. This is to enable us to plane off surface on Old Street and lay base course .
 
We appreciate you patience and understanding whilst we carryout these works.
 
The blog is updated daily so please visit regularly for up to date information.
 
Alternatively you can speak to our Liaison Officer Terry Godwin, who will be regularly available "on site" or at our site office at 38 Old Street during the works to listen to any concerns or issues.

Wednesday, 20 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we continue working on the High Street and Church Street area carrying out remedial works and installation of drainage channels.

There will be a road closure next Sunday 24th March. This is to enable us to plane off surface on Old Street and lay base course .
We appreciate you patience and understanding whilst we carryout these works.
The blog is updated daily so please visit regularly for up to date information.
Alternatively you can speak to our Liaison Officer Terry Godwin, who will be regularly available "on site" or at our site office at 38 Old Street during the works to listen to any concerns or issues.

Tuesday, 19 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will continue working on the High Street and Church Street area carrying out remedial works.

There will be a road closure next Sunday 24th March. This is to enable us to plane off surface on Old Street and lay base course .
We appreciate you patience and understanding whilst we carryout these works.
The blog is updated daily so please visit regularly for up to date information.
Alternatively you can speak to our Liaison Officer Terry Godwin, who will be regularly available "on site" or at our site office at 38 Old Street during the works to listen to any concerns or issues.

Monday, 18 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will continue working on the High Street and Church Street area installing drainage channels.

The work carried out this Sunday went well and to plan. See below pictures showing the planned surface and the carriagway surface with the base course laid.


A road closure will be necessary next Sunday 24th March on the High Street, Lower High Street, Old Street and Church Street area to enable us to lay the top course to the carriageway.
We appreciate you patience and understanding whilst we carryout these works.
The blog is updated daily so please visit regularly for up to date information. 
Alternatively you can speak to our Liaison Officer Terry Godwin, who will be regularly available "on site" or at our site office at 38 Old Street during the works to listen to any concerns or issues.

Friday, 15 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will continue with remedial works on the High Street and Old Street area installing drainage channels.

On Sunday 17th March, 2013 there will be a road closure to enable us to plane the surface and lay the base course on the carriageway in Lower High Street, High Street, and Church Street area including junction with Court Street and New Street.

This picture shows some of the completed footway resurfacing.

We appreciate you patience and understanding whilst we carryout these works.
The blog is updated daily so please visit regularly for up to date information. 
Alternatively you can speak to our Liaison Officer Terry Godwin, who will be regularly available "on site" or at our site office at 38 Old Street during the works to listen to any concerns or issues.

Thursday, 14 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will continue working on the High Street and Church Street area installing drainage channels.

We plan to carryout resurfacing work this Sunday 17th March on the High Street, Lower High Street, Old Street and Church Street area.
 
This will be carried out with a road closure.
 
Please note that these works are weather dependant and may have to change at short notice.

We appreciate you patience and understanding whilst we carryout these works.
 
The blog is updated daily so please visit regularly for up to date information. 
 
Alternatively you can speak to our Liaison Officer Terry Godwin, who will be regularly available "on site" or at our site office at 38 Old Street during the works to listen to any concerns or issues.

Wednesday, 13 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will continue working on the High Street and Church Street area installing drainage channels.

We plan to carryout resurfacing work this Sunday 17th March on the High Street, Lower High Street, Old Street and Church Street area.
 
This will be carried out with a road closure.
 
Please note that these works are weather dependant and may have to change at short notice.

We appreciate you patience and understanding whilst we carryout these works.
 
The blog is updated regularly so please visit daily for up to date information.
 
Alternatively you can speak to our Liaison Officer Terry Godwin, who will be regularly available "on site" or at our site office at 38 Old Street during the works to listen to any concerns or issues.
 

Tuesday, 12 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we are working on the High Sreet and Church Street area installing drainage channels.

We plan to carryout resurfacing work this Sunday 17th March in the High Street Old Street area which will be carried out with a road closure. Please note that these works are weather dependant and may have to change at short notice.

The picture below shows the completed red ashphalt surfacing on Old Street.



We appreciate your patience and understanding whilst we carryout these works.

This blog is updated regularly so please visit daily for up to date information.

Monday, 11 March 2013

Upton-upon-Severn -High Street & Old Street improvement works

Today we are carrying out some general drainage reinstatements to cause the minimum amount of disruption whilst Old Street has been closed by another contractor to carryout some repair works.


This picture shows the red ashphalt surface being laid on
 Old Street

We appreciate your patience and understanding whilst we carryout these works.

The blog is updated regularly so please visit daily for up to date information.

Friday, 8 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will plan to complete laying the red ashphalt top surface to the footways on the build out in Old Street juncion with Backfields Lane, Old Street east side and on Church Street.

This will be carried out under Stop and Go traffic management to minimise disruption to the traffic.


This picture was taken earlier in the week when the top surface was laid outside the old HSBC bank juncion of New Street and High Street.


No work is planned for this weekend.

We appreciate your patience and understanding whilst we carryout these works.

The blog is updated on a regularly so please visit daily for up to date information.

Thursday, 7 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will be working on the east side of Old Street laying the red ashphalt surface dressing.

We have been asked to extend a length of footway in Church Street which will be excavated and  the  base course laid today.

This work will be carried out under Stop and Go traffic management.


This picture shows some of the completed resurfacing



The blog is updated regularly so please visit daily for up to date information.

We appreciate your patience and understanding whilst we carryout these works.

Wednesday, 6 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will be working on Old Street on the east side continuing with kerbing and drainage works. We are unable to lay the red ashphalt top surface today as the materials have not arrived as planned.



This will now be laid tomorrow once the materials have been delivered.

To ease traffic movement today Stop and Go traffic management will be used.

We appreciate your patience and understanding whilst we carryout these works.

The blog is updated regularly so please visit daily for up to date information.

Tuesday, 5 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will be working on the west side of Old Street laying red ashphalt to the footpath. Kerb stones are also being laid.

To cause the least disruption to traffic this will be carried out under stop and go traffic management.




This picture was taken yesterday of the newly laid red ashphalt on the footpath outside the former HSBC Bank on the corner of High Street and New Street.


We appreciate your patience and understanding whilst we carryout these works.

This blog is updated regularly so please visit daily for up to date information.

Monday, 4 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will be laying the red ashphalt surface layer to the footway on High Street. We will also be laying some odd kerbs on the east side of Old Street. The traffic will be managed by Stop and Go.


We appreciate your patience and understanding whilst we carryout these works.

This blog is updated regularly so please visit daily for up to date information.

Friday, 1 March 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we are installing kerbing on Old Street.  To minimise disruption to the traffic this will be carried out on a stop and go.

The plan today was originally to lay the red ashphalt surface course on the High Street but unfortunately the materials have not arrived on time, therefore this will be laid on Monday.

Old Street will be closed this Sunday 3rd March, 2013 whilst another contractor carries out some works. We are taking the opportunity to minimise disruption to install some kerbing along Old Street.

We appreciate your patience and understanding whilst we carryout these works.

This blog is updated regularly so please visit daily for up to date information.

Thursday, 28 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will be working on the High Street outside the White Lion Hotel and Backfields Lane junction with Old Street constructing a build out of the pavement.

Traffic management will not be required to carryout this work.

Tomorrow we will be working in the High Street laying the red ashphalt surface course to the footway.
We have been advised that Old Street will be closed this Sunday 3rd March, 2013 but this is for works by another contractor and does not relate to our improvement works.

We appreciate your patience and understanding whilst we carryout these works.
This blog is updated regularly so please visit daily for up to date information.

Wednesday, 27 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will be working on the High Street, west side laying the red ashphalt surface to the footway. Drainage and kerbing works will also be taking place on Old Street.

To ease traffic movement today Stop and Go will be used instead of traffic lights at the junction with Church Street and High Street.

We appreciate your patience and understanding whilst we carryout these works.
 
The blog is updated regularly so please visit daily for up to date information.

Tuesday, 26 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will be working in Church Street excavating and laying the basecourse to the footway.

To ease traffic movement today we will use Stop and Go instead of traffic lights.

We appreciate your patience and understanding whilst we carryout these works.
 
The blog is updated regularly so please visit daily for up to date information.

Monday, 25 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we are continuing to work on the west side of the High Street into New Street  renewing the kerbs.

Tomorrow we will be working in Church Street excavating and laying the basecourse to the footway.

To ease traffic movement tomorow we will use Stop and Go instead of traffic lights.

We appreciate your patience and understanding whilst we carryout these works.

Thursday, 21 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we are working on the west side of the High Street renewing kerbs and excavating the footway.
 
Tomorrow we will be working on the west side of the High Street again excavating the footway and laying the basecourse.

Works will take place on Old Street this Sunday 24th February, within a road closure. This will consist of excavating the existing surface and laying of the basecourse to tarmac.

We appreciate your patience and understanding whilst we carryout these works.

Wednesday, 20 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today surfacing works took place on Old Street, the works on Court Street have proceeded ahead of schedule therefore the road closure is being removed to minimise any possible disruption.

The works planned for 21st February will consist of renewing kerbs and excavating the footway on High Street.



Works will take place on Old Street this Sunday 24th February, within a road closure. This will consist of excavating the existing surface and laying of the basecourse to tarmac.

We appreciate your patience and understanding whilst we carryout these works.

Monday, 18 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will be installing kerbing and concrete drainage channels in Old Street. If this goes to plan this afternoon we will start laying the red ashphalt surface course along New Street.

Court street will be closed today for some drainage works to take place.  As a result of this and to minimise any potential further disruption some patchway works will also be carried out at the same time.  

We will continue to update this blog on a daily basis to provide the most up to date information.

Friday, 15 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we are continuing to lay the red ashphalt surface course along Church Street and at the junction with High Street (East Side) into New Street.



On Monday and Tuesday next week we will be working in Old Street installing the kerbing and fluted channels to the footpath. We will also start excavating and laying binder course on the High Street west side.

As previously advised Old Street will no longer be closed on Sunday 16th February, 2013.  As a result of this and to minimise any potential disruption the works are being rescheduled . We will advise dates as soon as possible.


We will continue to update this blog on a daily basis to provide the most up to date information.

Thursday, 14 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today the works are going as previously advised the attached photo shows the red ashphalt being laid



Tomorrow we plan to continue working on the east side of the High Street where we will be laying the surface course to the footway and excavating the kerbline.

We will be monitoring river levels this week and will continue to update this blog on a daily basis to provide the most up to date information

Wednesday, 13 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we will continue excavating the footway on New Street to the end of the shops. New kerb stones will also be laid.



This work can be carried out without the use of traffic signals or road closures and should not impede on the traffic flow.

Thursday and Friday this week we plan to work on the High Street where we will be laying the wearing course to the footway and excavating the kerbline.

We will be monitoring river levels this week and will continue to update this blog on a daily basis to provide the most up to date information.

Tuesday, 12 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today and tomorrow we will be excavating the footway on New Street to the end of the shops. We will also be laying new kerb stones.

This work can be carried out without the use of traffic signals or road closures and should not impede on the traffic flow.

Thursday and Friday this week we plan to work on the High Street where we will be laying the wearing course to the footway and excavating the kerbline.

We will be monitoring river levels this week and will continue to update this blog on a daily basis to provide the most up to date information.

Monday, 11 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Due to the current cold weather conditions, improvements works have been affected.  The work that was scheduled for Old Street yesterday and today has been postponed.
 
A new programme of works will therefore need to be put in place.

We will continue to update this blog on a daily basis and will provide information as soon as we can, notifying as to when the works will re-commence once the cold weather has started to clear.

We apologise for any inconvenience circumstances beyond our control may have caused.

Friday, 8 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we are returning to Old Street (west side) to continue excavation of the footway ready for the binder course to be laid. There will also be some kerb repairs.


This work will be carried out using two way temporary traffic lights.

Old Street will no longer be closed from Monday 11th to Friday 15th February. As a result of this and to minimise any potential disruption the works have been rescheduled to be carried out over the next three consecutive Sundays. These days being Sunday 10th,17th and 24th February and will be carried out under road closures.

We will continue to update this blog on a daily basis, so please visit for the latest information on progress.

Thursday, 7 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

Today we are returning to Old Street (west side) to continue footway and kerbing works.

This work will be carried out using two way temporary traffic lights.

Old Street will no longer be closed from Monday 11th to Friday 15th February. As a result of this and to minimise any potential disruption the works have been rescheduled to be carried out over the next three consecutive Sundays. These days being Sunday 10th,17th and 24th February and will be carried out under road closures.

We will continue to update this blog on a daily basis, so please visit for the latest information on progress.

Wednesday, 6 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

The works being carried out today are located at High Street (east side by the White Lion Hotel), these consist of footway construction and kerbing works.

On Thursday and Friday of this week, we will be returning to Old Street (west side) to continue footway and kerbing works, this work will be carried out under two way temporary traffic lights.

Old Street will no longer be closed from Monday 11th to Friday 15th February. As a result of this and to minimise any potential disruption the works have been rescheduled to be carried out over the next three consecutive Sundays. These days being Sunday 10th,17th and 24th February and will be carried out under road closures.

We will continue to update this blog on a daily basis, so please visit for the latest information on progress.

Tuesday, 5 February 2013

Upton-upon-Severn - High Street & Old Street improvement works

We will continue working on the east side of the High Street (White Lion Hotel side) excavating the kerbline and relaying new kerbs.


All this work can be done without the use of traffic signals or road closures and should not impede the traffic flow, due to the width of the High Street.

The road closure booked for Old Street for 4th February, 2013 has been put back a week to 11th February, 2013 due to the current flooding.

We will continue to update this blog on a daily basis to provide the most up to date information.